Field-controls STARKAP SK-1 Manual de usuario Pagina 3

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 12
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 2
Page 3
INSTALLATION
1. Before installation, apply two beads of high temperature
silicone sealant or equivalent around the bottom of the storm
collar and 1 inch above the end of the Starkap™ body. (See
Figure 2)
2. Insert the Starkap™ into the inside of the vent termination
pipe, making sure the Starkap™ is seated against the storm
collar. Fasten the Starkap™ to the vent termination pipe by
using three (3) sheet metal screws. Placement of the screws
should be approximately 1/2 inch from the end of the vent termination pipe. (See Figure 3) The
heads of the screws should be covered with high temperature.
Figure 2
Figure 3
Vista de pagina 2
1 2 3 4 5 6 7 8 ... 11 12

Comentarios a estos manuales

Sin comentarios